Campbell CM10 Manual de Instalação Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 6
Section 1. Preparation and Siting
1.1 Installation Tasks
1.1.1 Indoors
Immediately upon receipt of your shipment…
Open shipping cartons.
Check contents against invoice. Contact CSI immediately about any
shortages.
Several days prior to the planned installation date…
Collect tools and site information (Section 1)
Assemble datalogger, communications device, and power supply in
enclosure (Section 3)
Install datalogger support software on PC (Section 5)
Establish communications between the datalogger and the PC
(Section 5)
Program datalogger, test sensors, and retrieve data (Section 5)
Trial run the tripod installation, assembling as much as possible
(Section 2)
Repackage equipment for transport to the field site
1.1.2 Outdoors
Locate suitable site (Section 1)
Prepare tower or tripod base (Section 2)
Raise tripod (Section 2)
Install instrumentation enclosure (Section 3)
Install sensors (Section 4)
1-1
Vista de página 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 67 68

Comentários a estes Manuais

Sem comentários