Campbell RAWS-P Manual Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 34
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
RAWS-P Remote Automated Weather Station
2. Getting Started
Set up and test your station before field deployment.
NOTE
Keep this manual and the CR1000KD Keyboard Display
with the RAWS. Review the station siting and orientation
section before field deployment. If a problem is encountered,
review the equipment wiring and troubleshooting sections in this
manual.
NOTE
After siting and leveling the RAWS station, open the enclosure and
(1) connect the battery cable and (2) verify the CH100 switch is in
the ‘on’ position. When this equipment is not in use (i.e.,
transport or storage), disconnect battery cable to the CH100.
NOTE
2
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 33 34

Comentários a estes Manuais

Sem comentários