CM375 Portable 10-Meter Mast
Step 2: Place Section 1 at deployment location with base oriented, as shown in
FIGURE 3-4 and mast pointing NORTH.
A compass is included in the optional “Tensioning Kit” for your
use.
FIGURE 3-4. Mast Section 1 oriented on base
Step 3: Use spikes provided (3 each) to anchor base to site (see FIGURE 3-5).
Always maintain a safe distance between the mast and
any overhead power lines. Contact local utilities prior
to assembling the mast to locate any buried utility lines
in the area the mast is to be installed.
NOTE
WARNING
NORTH
5