Campbell NL100 Manual do Utilizador Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 44
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
November 2005, ARM-TR-069
B-1
SURTHREF
Six-Month Calibration Procedures
Frequency: Twice a year
Mentor: Michael Ritsche, Barry Lesht
To verify the accuracy and installation of the six temperature and RH probes the following will
need to be accomplished:
Remove the humidity cap from each of the sensors and clean or replace. The Vaisala probe
humidity cap is replaced on a similar time frame to the SMOS replacement. The Rotronic
humidity cap is made of wire mesh. This cap should be gently cleaned using a mild detergent and
soft bristled brush. It will need to dry thoroughly before re-installation. If major damage has
occurred, the humidity cap should be replaced.
Verification of the sensors is done with the Vaisala HMI31/HMP35 temperature and RH meter.
Set or hold the measuring portion of the meter inside the polypropylene aspirated chamber.
Ensure that the meter is centered and at similar height to the measuring portion of the six probes.
Turn on the meter and allow it to stabilize so that the meter readings are changing by less than
0.2°C and 1% RH. When the meter has stabilized, wait an additional five minutes before taking
readings. The readings from the sensors are available inside the sonde trailer and are located on
the PC in the program called BBSSRef.RTMC.
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 43 44

Comentários a estes Manuais

Sem comentários